With the global shift to clean energy technology and electric vehicle legislation fast approaching, the demand for Lithium necessitates a conscientious approach as we enter a new Industrial Revolution.
We’ve recently designed, assembled, and installed a pilot plant for Cornish Lithium at their Geothermal Test Facility at United Downs in Cornwall. Our ground-breaking 2 stage system provides a lower cost recovery of Lithium salts from geothermal brine by employing a contemporary energy efficient solution.
Operational site trials are underway, and we look forward to delivering further collaborative support during this leading-edge program.
Contact us to arrange a free survey, then discover and explore what savings are possible for your business.
sales@kirton.co.uk
01509 504565
www.kirton.co.uk